.01、 展柜制作能否尺度化定制,适应种种差异店面形状?
完全可以尺度化制作,可适用于差异规格形状的店肆,从现有的展柜制作厂的大规模专业化,行业化可以体现出来!

Whether the production of showcase can be customized in standardization way? Can this standardized customization adapt different stores?

Yes it can be customized in standization way and can adapt stores in different shapes and sizes, it can appear from professionalization in exisiting showcase factory.


2、 展柜制作后远程运输问题如何解决,会不会造成损坏?
我们已经乐成与多个品牌相助,这些品牌客户全是做商场专柜制作或专卖店的加盟连锁模式!柜体我们是接纳相对拆装看法的,即在运输省用度和安装方便上寻求最佳结合点,所以我们生产的柜体不会是全部拆散的这样倒霉于商场要求一个晚上安装完成的要求,虽然展柜制作也不建议是大型柜整体包装发货,这样会增大方数发生大量用度,同时产物的运输防损问题也将越发的严重。

How to solve the problem of long way delivery, any damage on the way?

We have cooperated with many brands, these customers are all doing shopping mall counters and exclusive stores. For the cabinet body we use relative dismounting concept, we don't dismount all the parts or package the whole cabinet, we seek a best joint between delivery and installation, easy installation with reasonable freight fee and safety delivery.


3、 展柜制作能否如宜家产物一样由各专卖店自行组装(自己或找普通木工)?
完全可以的,绝大部门展柜制作生产事情90%已经在车间完成,现在仅有10%的事情是现场安装,较好的设计方案可以做到,展柜制作安装如同购置家具一样轻松,找普通的木工也可安装,甚至部门道具几个营业员或是业务员辅佐即可完成搭建。虽然相助的更多品牌客户选择由我厂派安装人员协助安装,这样省事又方便也能确保准时开业。

Can we assemble these display shelves by ourselves or ordinary carpenters like IKEA products?

Of course, we finished 90% procedures in factory, only 10% rest is installation work. Better designs make easier installation, ordinary carpenters, even some salesmen can assemble easily. But most of the time our customers will ask our professional installation person to help, it can reduce unnecessary trouble and ensure opening day on time.


4、展柜制作与现场装修的土建工程如何配合?
行规来讲分成两个部门:A展柜制作的尺度道具生产(工厂方) B专卖店的现场墙体天花地板施工(装修队)。这两个部门各有优势:工厂可大量的采购原质料成批的生产劳动效率好,机械化,尺度化水平高,产物质量有保证,安装工期短通常一天或一晚上,最关健是全国统一的“形象外观”可有效提升品牌形象。 如果是做商场专柜的话天花地板你不能动,基本上不需要什么装修公司协助即可完成柜体安装准时开业。
虽然装修公司(队)能依现场尺寸协助您完成墙体的搭建,堆栈的简易货架制作,天花吊顶和装天花灯具以及地板处置和协助柜体搭建都起做关健做用特别是在专卖店的操作下更为重要!

How to cooperate with shelf manufacture and site construction?

There are two parts in professional standard: A--Fixture manufactur(factory)  B--site construction(decoration team). Both of them have their advantages: factory can purchase raw materials to make mass production, good efficiency,mechanization and high degree of standardization,short installation period, the most important point it can keep unified image. If doing shopping mall counter we don't need to change ceiling structure and finish, that means we can install shelves without decoration team on time, and it will be better under their help.


5、专卖店(展柜制作)的灯光照明问题很是重要,灯光问题如何解决?是否在展柜上已经安装灯具配件,由当地人员连接即可?
我们的展柜制作通常凭据设计施工图纸已经配有灯具和电线,特殊情况还配有开关和外接主电线,并经过严格的厂检测定光照满足绝大部门零售照明要求。如几多色温K数的灯具,是射灯照旧日光灯管均经过测试后才接纳。由当地的执证电工连接即可使用并不庞大,同时们展柜制作厂也可全方位提供一站式服务。

Lighting issue is the point of exclusive store, how to slove it? Have the lighting devices been installed into shelves already and the only thing for local workers is to connect wires and switches?

Our shelves usually equipped with lamps and wires according to designs, in some special cases we also equipped with switches and external main wire, we have strict QC to assure lighting requirements for most stores. We have particular test for each light in colour temperture、selection of spotlight or daylight tube. It's not complex, you can find a local electrician to connect.


6、展柜制作的时间周期问题,展柜设计需要多长时间?下订单制作需要多长时间?

一套完整的设计方案通常需个多月,项目多的会增加设计时间,如果相同理解协调没问题,且您能更多的提供您的设计要求和想法或你的竞争对手款式,甚至是提供了大部门参考的照片我们的话,1周以内完成一个设计项目也没有问题。虽然好的设计作品不行能在一两天就完成,我们需要更多的了解你的产物和感受你的卖点,希望你能理解。

How long is the producing time? How long will it take from ordering?

A whole design usually needs several months, more items mean more time. If we can communicate and understand each other well, besides, you can provide design requirements and styles for reference, we can finish within one week. A perfect design can not be finished in one or two days, we need to know and feel more about your point.


下订单制作的时间首单在15日内次单起8日内可完成。如果连续下单则可边续出货。虽然在3-4月6-9月外的时段如果你计划得好的话,完全可以接纳备货制将大部门的道具模形由工厂完成,待出货岑岭期时直接打磨烤漆出货,这样您就是一天开一家店的速度也完全没有问题。

The first order will be finished within 15 days and the latter orders will complete in 8 days. If you place orders continually we can do shipment  and manufacture at the same time. Of course if you have good plans we can prepare most of the fixtures in advance,it will save much of your time to open new stores.